Mission: Constructing an energy structure and pumping station within a 29,000 km long reservoir.
Electricity: Execution of an electrical system with a high voltage connection of 80 A, including two 2,000 KVA transformers backed-up by two 1600 KVA generator, control system and MNM
Air conditioning: Constructing a comprehensive triple air blower system
Plumbing: Execution of a system for pumping drainage water, including 9 3000 mph drainage pumps and one 300 mph pump, 48" Main pipes and 24" connecting pipes